Lowrance Elite Ti2 detailed installation


Will Davis from Grift co. talks through the process of fitting two Elite9 Ti2s to his project tinnie. 👇🏼🧾🕐Timestamps for all the installation steps are listed below 🕐🧾👇🏼 Timestamps: 1:00 - Unboxing 3:57 - Disconnecting Battery 5:07 - Removing Old Sounder 7:30 - Placement of a New Sounder 9:58 - Planning wiring Sequence 11:52 - Drilling holes for cable routing 13:40 - Routing Transducer Cable 15:20 - Mounting Brackets to Transducer 17:48 - Mounting transducer to hull 17:56 - Connecting Blade fuse to power cable (before I feed the cable through) 22:03 - Re-wiring the blade fuse so we can fit everything through the routing holes 22:52 - Connecting power cables to BUS Bar / Switch Panel 24:25 - Initialising power to the cables 25:30 - Quick tips for plugging cables into the MFD (Multi Function Display) 26:47 - Powering up for the first time! http://bit.ly/2WddkCW Lowrance April 29, 2019 at 12:45AM